Whole house update
Kitchen, bathrooms, floors, paint and lighting in one schedule. Usually no change to the shape of the house.
A whole house renovation touches most rooms at once, with one plan, one schedule and one crew lead. We also build additions and fit out small shops and offices. The plan sets the order, so a finished room is never wrecked by the next trade.
Start with what is wrong, not with what is pretty. List the things that fail you every day, then fix structure and water first, then wiring and plumbing, then the rooms. Set the budget order too, so if money runs short, the finishes give way, not the roof. We put all of that in a room-by-room plan before we quote.
Big jobs come in three shapes. Each one starts with a different first question.
Kitchen, bathrooms, floors, paint and lighting in one schedule. Usually no change to the shape of the house.
A room added on, a second storey, or a rear extension. Zoning check, engineer, permit, then build.
A shop, a clinic or a small office. Layout, lighting, flooring, washrooms and finishes, built around your opening hours.
Open up a whole house and the past shows up. These three are the usual suspects.
Older houses hide knob-and-tube wiring, galvanized pipes and missing insulation. We budget a line for them and show you when we find them.
A beam cut by a past renovation. The engineer sizes a new one and we install it before anything else.
A past basement or deck done without a permit. We bring it up to code so the sale later goes smoothly.
A whole house update adds lights, appliances and often heat pumps. An older service may need an upgrade from the utility before the new rooms can be powered.
A whole house runs in six stages. The order is the same every time: structure, systems, rooms. The stages shared by every job, plan through finish, are on the process page.


Example houses that show the scale of this work, not our own projects. We show our own before-and-after photos in person.
Every room gets a line: what changes, what stays, what order.
Structural changes get an engineer. Additions get a zoning check first. Permits are filed.
Beams, roofs and foundations first, then wiring, plumbing and ducts while everything is open.
Framing, insulation and drywall, inspected at each stage.
Kitchen, bathrooms, floors, paint and lights, in the order the plan set.
A walk-through of every room, paperwork for every permit, one list of touch-ups done before we leave.
On a whole house, scope is the price. These five decide most of it.
If your house needs a new roof or foundation work before anything else, a roofing or foundation company goes first. We say so at the first meeting and come back when they are done.
Two whole-house questions families ask before they decide.
Split the house into zones and do one zone at a time. Keep one bedroom, one bathroom and a place to cook working at all times. We seal the work zone with dust walls, set daily start and stop times, and schedule the loud days for when you are out.
You can stay through most of it. The weeks of demolition and drywall dust are the hard ones, and some clients leave for those. If the kitchen and every bathroom are being done at once, moving out for a short stretch is easier and often faster.